Mobile Home Park
Fair Park Estates
613 N Eye St, Harlingen, TX 78550
Listing Price: $1,500,000
Investment Overview
Fair Park Estates is a 69-site property located in Harlingen, Texas. The property sits on
3.19 acres, and the space mix is comprised of 26 RV Lots, 24 Vacant Lots, eight Mobile
Home Lot Rents, four Office/Apartments, three Home Demos, two RV Demos, and two
Park-Owned RV/Homes. The property operates on city water and sewer with all utilities
paid for by the residents except for trash, which is paid for by the ownership.
Harlingen sits in Cameron County in the central Rio Grande Valley. Healthcare anchors
the local economy, with five of the city's ten largest employers in the industry. Major
employers include Harlingen CISD, Valley Baptist Medical Center, Harlingen Medical
Center, VA Texas Valley Coastal, and the City of Harlingen. Harlingen CISD posted
academic gains in the Texas Education Agency's 2025 accountability ratings. Eight
campuses earned an A rating, the district score rose from 82 to 86, and the district earned
the Postsecondary Readiness distinction as one of only 83 districts in Texas.
Fair Park Estates sits 1.5 miles from Interstate 2, which sees 96,000 vehicles daily, and 1.5
miles from Interstate 69E, which sees 87,500 vehicles daily. Valley International Airport is
approximately 6 miles from the property. Each winter, retirees from northern states and
Canada spend October through March in the Rio Grande Valley, generating a total
economic impact of nearly $2 billion. Harlingen also hosts the annual Rio Grande Valley
Birding Festival at the Harlingen Convention Center, scheduled for November 11 to 15,
2026. Birders travel to the Valley for 30 of Texas's 900 bird species found nowhere else in
the state.
RECENT DEVELOPMENTS
• October 2026: Garver, a multidisciplinary engineering firm, is scheduled to hold a
ribbon cutting on October 13, 2026 for its new Harlingen office. The $5 million project
includes a one-story, 25,000-square-foot office on 3.2 acres at Ed Carey Drive and Hale
Avenue with room for up to 130 employees. Garver plans to hire 50 new employees. The
office anchors a planned 70-acre mixed-use development near Harlingen's medical
district.
• September 2026: Saronic Technologies broke ground on Port Alpha at the Port of
Brownsville, a shipyard representing more than $3 billion in private investment. The
initial site covers 835 acres with an option to expand to nearly 4,400 acres. Saronic
expects Port Alpha to create up to 10,000 direct jobs over the next decade, with operations
expected to begin in 2028.
• In progress: The City of Harlingen is building its first kayak launch along the Arroyo
Colorado at South 25th Street and Ed Carey Drive. The $500,000 project includes a
parking lot, restroom building, and sidewalks, with completion scheduled for December
2026.
• In progress: The Texas Health and Human Services Commission is building a 50-bed
hospital at the Rio Grande State Center campus. Construction began in September 2025
on the 103,340-square-foot facility, which carries an estimated cost of $111.6 million. The
hospital will include private patient rooms, diagnostic and treatment spaces,
administrative offices, food services, and laundry. Completion is scheduled for May 2027.
• May 2026: The University of Texas System Board of Regents approved design plans and
a $42.3 million funding package to convert the former Albertson's property at 2222 S. 77
Sunshine Strip into the UTRGV Departments of Physical and Occupational Therapy.
Completion is expected by spring 2027. Once complete, the programs expect cohorts of
about 40 physical therapy students and 32 occupational therapy students.
• May 2026: VFW Post 2410 broke ground on a new $2.5 million facility to replace its
storm-damaged headquarters. Construction is expected to take 10 months.
Investment Highlights
- Offered at 8.27% Day One Cap Rate
- Hybrid Asset With Majority Resident Owned Mobile Homes and RVs
- Operates on City Water and Sewer
- Opportunity to Infill Vacant Lots
- Approximately 6 Miles From Valley International Airport
Exclusively Listed By
Listing Price: $1,500,000
Investment Highlights
- Offered at 8.27% Day One Cap Rate
- Hybrid Asset With Majority Resident Owned Mobile Homes and RVs
- Operates on City Water and Sewer
- Opportunity to Infill Vacant Lots
- Approximately 6 Miles From Valley International Airport
Investment Overview
Fair Park Estates is a 69-site property located in Harlingen, Texas. The property sits on 3.19 acres, and the space mix is comprised of 26 RV Lots, 24 Vacant Lots, eight Mobile Home Lot Rents, four Office/Apartments, three Home Demos, two RV Demos, and two Park-Owned RV/Homes. The property operates on city water and sewer with all utilities paid for by the residents except for trash, which is paid for by the ownership. Harlingen sits in Cameron County in the central Rio Grande Valley. Healthcare anchors the local economy, with five of the city's ten largest employers in the industry. Major employers include Harlingen CISD, Valley Baptist Medical Center, Harlingen Medical Center, VA Texas Valley Coastal, and the City of Harlingen. Harlingen CISD posted academic gains in the Texas Education Agency's 2025 accountability ratings. Eight campuses earned an A rating, the district score rose from 82 to 86, and the district earned the Postsecondary Readiness distinction as one of only 83 districts in Texas. Fair Park Estates sits 1.5 miles from Interstate 2, which sees 96,000 vehicles daily, and 1.5 miles from Interstate 69E, which sees 87,500 vehicles daily. Valley International Airport is approximately 6 miles from the property. Each winter, retirees from northern states and Canada spend October through March in the Rio Grande Valley, generating a total economic impact of nearly $2 billion. Harlingen also hosts the annual Rio Grande Valley Birding Festival at the Harlingen Convention Center, scheduled for November 11 to 15, 2026. Birders travel to the Valley for 30 of Texas's 900 bird species found nowhere else in the state. RECENT DEVELOPMENTS • October 2026: Garver, a multidisciplinary engineering firm, is scheduled to hold a ribbon cutting on October 13, 2026 for its new Harlingen office. The $5 million project includes a one-story, 25,000-square-foot office on 3.2 acres at Ed Carey Drive and Hale Avenue with room for up to 130 employees. Garver plans to hire 50 new employees. The office anchors a planned 70-acre mixed-use development near Harlingen's medical district. • September 2026: Saronic Technologies broke ground on Port Alpha at the Port of Brownsville, a shipyard representing more than $3 billion in private investment. The initial site covers 835 acres with an option to expand to nearly 4,400 acres. Saronic expects Port Alpha to create up to 10,000 direct jobs over the next decade, with operations expected to begin in 2028. • In progress: The City of Harlingen is building its first kayak launch along the Arroyo Colorado at South 25th Street and Ed Carey Drive. The $500,000 project includes a parking lot, restroom building, and sidewalks, with completion scheduled for December 2026. • In progress: The Texas Health and Human Services Commission is building a 50-bed hospital at the Rio Grande State Center campus. Construction began in September 2025 on the 103,340-square-foot facility, which carries an estimated cost of $111.6 million. The hospital will include private patient rooms, diagnostic and treatment spaces, administrative offices, food services, and laundry. Completion is scheduled for May 2027. • May 2026: The University of Texas System Board of Regents approved design plans and a $42.3 million funding package to convert the former Albertson's property at 2222 S. 77 Sunshine Strip into the UTRGV Departments of Physical and Occupational Therapy. Completion is expected by spring 2027. Once complete, the programs expect cohorts of about 40 physical therapy students and 32 occupational therapy students. • May 2026: VFW Post 2410 broke ground on a new $2.5 million facility to replace its storm-damaged headquarters. Construction is expected to take 10 months.
Exclusively Listed By