Skip to main content

RV Park

60 North RV Park

501 Avenue F, Bay City, TX 77414

Listing Price: Request For Offer

Number of Spaces
93
Lot Size
15.54 acres
Occupancy
72.0%
Spaces/Acre
5.98
Year Built
2010

Investment Overview

60 North RV Park is a 93-site property located in Bay City, Texas, in Matagorda
County. The property was built in 2010 and sits on 15.54 acres. The site mix
includes 36 pull-thru sites among the 93 total spaces. The property operates on
city water and city sewer. Water, sewer, and trash are paid by the property, while
electric is paid for by the residents. Amenities include Wi-Fi, cable TV, laundry
facilities, restrooms, showers, a dog park, office, conference room, and a
playground.
Bay City is the county seat and largest city in Matagorda County, located on the
Texas Gulf Coast roughly 90 miles southwest of Houston. The county's economy
spans manufacturing, construction, energy, and agriculture, anchored by major
employers including the South Texas Project Electric Generating Station, one of the
largest nuclear power facilities in the nation.
Matagorda County draws visitors from across the region for its fishing, birding, and
hunting. The county is widely known as the Birding Capital of North America. The
Matagorda County Mad Island Marsh Christmas Bird Count led every count circle
in Texas with 232 species recorded in its most recent count. Matagorda Bay Nature
Park, a 1,334 acre coastal park along the Gulf of Mexico and Colorado River, draws
an estimated 50,000 visitors a year for birding, fishing, kayaking, and camping.
The bay also hosts recurring saltwater fishing tournaments throughout the year,
including the Texas Trio Classic and the Matagorda Mermaid Tournament, drawing
anglers who target redfish, trout, and flounder. Bay City sits along the Central
Flyway and serves as wintering grounds for a large share of the world's Redhead
duck population, supporting multiple hunting lodges and outfitters in the area.
Some of the recent notable developments in the area include:
March 2025: Röhm started production at its new methyl methacrylate plant in Bay
City, the only C2 based MMA facility in the United States. The 250,000 metric ton
plant created 70 direct jobs and reached 75 percent of planned production capacity
by November 2025, with full capacity expected in the first quarter of 2026.
Late 2025: Houston based Barrio Energy's first 10 megawatt data center project in
Matagorda County became operational, with a second site following in early 2026.
Both projects connect to the ERCOT South Zone.
December 2025: RWE completed construction of Peyton Creek II, a 243
megawatt wind farm in Matagorda County built to supply Microsoft under a 15-year
power purchase agreement. The project represents an investment of roughly $300
million and is expected to contribute an estimated $300 million to the local tax
base over its operating life.
December 2025: Linea Energy closed debt financing and issued a full notice to
proceed on the Duffy battery energy storage project in Matagorda County, a 235
megawatt, 470 megawatt-hour utility scale battery system. DESRI signed a
preferred equity investment in the project in February 2026.
December 2025: The U.S. Army Corps of Engineers awarded an $86.3 million
contract for the Sargent Beach Stabilization and Beach Nourishment Project, in
partnership with the Texas General Land Office, Matagorda County, and the Port of
Bay City. The project includes a rock terminal groin, five nearshore rock
breakwaters, and roughly 1 million cubic yards of beach nourishment, with
completion expected by mid to late 2027.
May 2026: Enbridge sanctioned a $400 million, 25 Bcf expansion of its Tres
Palacios Gas Storage facility in Matagorda County. The project will add three
new salt caverns and bring total facility storage capacity to about 64 Bcf. The
new capacity is expected to enter service between 2028 and 2030.

Investment Highlights

  • 93 Total Sites – Large Concrete Pads
  • Operates on Public Utilities
  • Approximately 78 Miles from Houston
  • Less Than Ten Minutes from H-E-B Grocery
  • Amenities Include: Restrooms, Laundry Facilities, Office, Conference Room, and Wi-Fi

Exclusively Listed By

RV Park

60 North RV Park

Listing Price: Request For Offer

Number of Spaces
93
Lot Size
15.54 acres
Occupancy
72.0%
Spaces/Acre
5.98
Year Built
2010

Investment Highlights

  • 93 Total Sites – Large Concrete Pads
  • Operates on Public Utilities
  • Approximately 78 Miles from Houston
  • Less Than Ten Minutes from H-E-B Grocery
  • Amenities Include: Restrooms, Laundry Facilities, Office, Conference Room, and Wi-Fi

Investment Overview

60 North RV Park is a 93-site property located in Bay City, Texas, in Matagorda County. The property was built in 2010 and sits on 15.54 acres. The site mix includes 36 pull-thru sites among the 93 total spaces. The property operates on city water and city sewer. Water, sewer, and trash are paid by the property, while electric is paid for by the residents. Amenities include Wi-Fi, cable TV, laundry facilities, restrooms, showers, a dog park, office, conference room, and a playground. Bay City is the county seat and largest city in Matagorda County, located on the Texas Gulf Coast roughly 90 miles southwest of Houston. The county's economy spans manufacturing, construction, energy, and agriculture, anchored by major employers including the South Texas Project Electric Generating Station, one of the largest nuclear power facilities in the nation. Matagorda County draws visitors from across the region for its fishing, birding, and hunting. The county is widely known as the Birding Capital of North America. The Matagorda County Mad Island Marsh Christmas Bird Count led every count circle in Texas with 232 species recorded in its most recent count. Matagorda Bay Nature Park, a 1,334 acre coastal park along the Gulf of Mexico and Colorado River, draws an estimated 50,000 visitors a year for birding, fishing, kayaking, and camping. The bay also hosts recurring saltwater fishing tournaments throughout the year, including the Texas Trio Classic and the Matagorda Mermaid Tournament, drawing anglers who target redfish, trout, and flounder. Bay City sits along the Central Flyway and serves as wintering grounds for a large share of the world's Redhead duck population, supporting multiple hunting lodges and outfitters in the area. Some of the recent notable developments in the area include: March 2025: Röhm started production at its new methyl methacrylate plant in Bay City, the only C2 based MMA facility in the United States. The 250,000 metric ton plant created 70 direct jobs and reached 75 percent of planned production capacity by November 2025, with full capacity expected in the first quarter of 2026. Late 2025: Houston based Barrio Energy's first 10 megawatt data center project in Matagorda County became operational, with a second site following in early 2026. Both projects connect to the ERCOT South Zone. December 2025: RWE completed construction of Peyton Creek II, a 243 megawatt wind farm in Matagorda County built to supply Microsoft under a 15-year power purchase agreement. The project represents an investment of roughly $300 million and is expected to contribute an estimated $300 million to the local tax base over its operating life. December 2025: Linea Energy closed debt financing and issued a full notice to proceed on the Duffy battery energy storage project in Matagorda County, a 235 megawatt, 470 megawatt-hour utility scale battery system. DESRI signed a preferred equity investment in the project in February 2026. December 2025: The U.S. Army Corps of Engineers awarded an $86.3 million contract for the Sargent Beach Stabilization and Beach Nourishment Project, in partnership with the Texas General Land Office, Matagorda County, and the Port of Bay City. The project includes a rock terminal groin, five nearshore rock breakwaters, and roughly 1 million cubic yards of beach nourishment, with completion expected by mid to late 2027. May 2026: Enbridge sanctioned a $400 million, 25 Bcf expansion of its Tres Palacios Gas Storage facility in Matagorda County. The project will add three new salt caverns and bring total facility storage capacity to about 64 Bcf. The new capacity is expected to enter service between 2028 and 2030.

Exclusively Listed By

MM Texture Background
MM Textured Background Lower