Skip to main content

Multifamily

Victor Portfolio

204,208,311 Victor Ave, Victor, CO 80860

Listing Price: $812,000

Cap Rate
9.41%
Number of Units
12
GRM
5.34
Occupancy
80.0%
Price/Unit
$67,667
Price/Gross SF
$78.85
Gross SF
10,298

Investment Overview

Marcus & Millichap is pleased to present the Victor Avenue Portfolio, located at 204, 208 and 311 Victor Avenue in the historic downtown core of Victor, Colorado, five miles from Cripple Creek in the heart of the Cripple Creek Mining District. This 12-unit portfolio was built in 1899 and consists of two studios, one one-bedroom, eight two-bedroom and one three-bedroom unit across three brick buildings, several with lofts, with the adjacent vacant parcel at 202 Victor Avenue included in the offering. All three buildings sit within 425 feet of one another on the same block inside the Victor Downtown Historic District, listed on the National Register of Historic Places, roughly one hour from Colorado Springs and 28 miles from Woodland Park.

The portfolio has been cared for by a hands-on owner who has reinvested continuously — new roofing, a full electrical upgrade at 208 Victor Avenue with individual panels, replaced plumbing and sewer lines, gas forced-air heat in the 311 units and the newest 204 renovation, and multiple fully renovated units with carpet removed portfolio-wide. The upside is immediate: three of the twelve units return to service on completion of work already underway — two at 208 Victor Avenue behind a firewall and a 1,200-squarefoot former unit at 204 awaiting build-back — and every lease but one is month-to-month, giving a new owner control of the roster from day one. Beyond the twelve, the rear wing of 311 Victor Avenue offers space for additional units with architectural drawings already prepared through the Colorado Main Street program and grant funding available.

Victor’s economy is anchored by gold and gaming. The Cripple Creek & Victor Mine, acquired by SSR Mining in February 2025, employs roughly 430 workers, published a 12-year, 2.8-million-ounce life-of-mine plan in November 2025, and pays the City of Victor $770,000 per year for the next ten years under a 25-year water agreement. Five miles away, Cripple Creek’s casino district has been transformed by the removal of bet limits in 2021 and the $300 million, 300-room Chamonix Casino Hotel that opened in December 2023. Housing is structurally undersupplied: the Cripple Creek–Victor housing study found rental vacancy below two percent with no units advertised in Victor, 70 percent of employees commuting in, and only one new home built in Victor since 2011. The Victor Avenue Portfolio is positioned to capture that demand — twelve units on one historic block in an employed, diversified economy, at an entry basis the rest of the Pikes Peak region left behind years ago.

Investment Highlights

  • Two units at 208 return on completion of the firewall; a 1,200 SF former unit at 204 awaits build-back — three added income streams without buying another building.
  • The rear wing of 311 supports additional units; architectural plans already prepared through the Colorado Main Street program, with grant funding available.
  • All but one lease is month-to-month, giving a new owner control of tenancy, renovation sequencing and repositioning from the day of closing.
  • New roofing, full electrical upgrade with per-unit panels at 208, replaced plumbing and sewer lines, gas forced-air heat and multiple fully renovated units.
  • SSR's 12-year, 2.8M-oz plan and $7.7M in water payments to Victor; Cripple Creek casinos five miles away; sub-2% rental vacancy, no new supply.

Exclusively Listed By

Multifamily

Victor Portfolio

Listing Price: $812,000

Cap Rate
9.41%
Number of Units
12
GRM
5.34
Occupancy
80.0%
Price/Unit
$67,667
Price/Gross SF
$78.85
Gross SF
10,298

Investment Highlights

  • Two units at 208 return on completion of the firewall; a 1,200 SF former unit at 204 awaits build-back — three added income streams without buying another building.
  • The rear wing of 311 supports additional units; architectural plans already prepared through the Colorado Main Street program, with grant funding available.
  • All but one lease is month-to-month, giving a new owner control of tenancy, renovation sequencing and repositioning from the day of closing.
  • New roofing, full electrical upgrade with per-unit panels at 208, replaced plumbing and sewer lines, gas forced-air heat and multiple fully renovated units.
  • SSR's 12-year, 2.8M-oz plan and $7.7M in water payments to Victor; Cripple Creek casinos five miles away; sub-2% rental vacancy, no new supply.

Investment Overview

Marcus & Millichap is pleased to present the Victor Avenue Portfolio, located at 204, 208 and 311 Victor Avenue in the historic downtown core of Victor, Colorado, five miles from Cripple Creek in the heart of the Cripple Creek Mining District. This 12-unit portfolio was built in 1899 and consists of two studios, one one-bedroom, eight two-bedroom and one three-bedroom unit across three brick buildings, several with lofts, with the adjacent vacant parcel at 202 Victor Avenue included in the offering. All three buildings sit within 425 feet of one another on the same block inside the Victor Downtown Historic District, listed on the National Register of Historic Places, roughly one hour from Colorado Springs and 28 miles from Woodland Park. The portfolio has been cared for by a hands-on owner who has reinvested continuously — new roofing, a full electrical upgrade at 208 Victor Avenue with individual panels, replaced plumbing and sewer lines, gas forced-air heat in the 311 units and the newest 204 renovation, and multiple fully renovated units with carpet removed portfolio-wide. The upside is immediate: three of the twelve units return to service on completion of work already underway — two at 208 Victor Avenue behind a firewall and a 1,200-squarefoot former unit at 204 awaiting build-back — and every lease but one is month-to-month, giving a new owner control of the roster from day one. Beyond the twelve, the rear wing of 311 Victor Avenue offers space for additional units with architectural drawings already prepared through the Colorado Main Street program and grant funding available. Victor’s economy is anchored by gold and gaming. The Cripple Creek & Victor Mine, acquired by SSR Mining in February 2025, employs roughly 430 workers, published a 12-year, 2.8-million-ounce life-of-mine plan in November 2025, and pays the City of Victor $770,000 per year for the next ten years under a 25-year water agreement. Five miles away, Cripple Creek’s casino district has been transformed by the removal of bet limits in 2021 and the $300 million, 300-room Chamonix Casino Hotel that opened in December 2023. Housing is structurally undersupplied: the Cripple Creek–Victor housing study found rental vacancy below two percent with no units advertised in Victor, 70 percent of employees commuting in, and only one new home built in Victor since 2011. The Victor Avenue Portfolio is positioned to capture that demand — twelve units on one historic block in an employed, diversified economy, at an entry basis the rest of the Pikes Peak region left behind years ago.

Exclusively Listed By

MM Texture Background
MM Textured Background Lower